Operating model

Elastic Outcome Engineering

An operating model for engineering beyond fixed capacity.

Your engineers have AI tools and tell you they are faster. Your delivery dates have not moved. Incidents are up, review queues are longer, and the board wants to know where the gains went.

The tools work. The operating model around them was built for a fixed number of people writing code by hand, and it cannot absorb what the tools produce. This is the model I run in its place. It turns AI output into shipped, verified results, and it tells you at any moment what is ready and who approved it.

A diagram in three horizontal bands. In the top band one owner holds a single line that runs from the starting point to the finished outcome. At three points work is delegated down into the middle band, where it fans out into two, then five, then three parallel paths. One path is stopped early. Each group of paths converges and drops into the bottom band to pass a gate, and only then returns up to the owner’s line. Every gate also writes to a shared record that runs along the bottom and connects three stores.
One owner holds the outcome from start to finish. Work is delegated down, fans out as far as each piece needs, and comes back only through a gate. Every gate writes to the record.
Chapters
  1. The changing constraint
  2. Beyond Agile
  3. The Elastic Manifesto
  4. Continuous Orchestration
  5. A day inside my operating model
  6. Measuring what matters
  7. Adopt the framework

Chapter 01

The changing constraint

Engineering planning has always started from headcount. You estimate what a team of a known size can finish in a fixed window and you commit to it. Capacity is the fixed input and scope flexes around it. Every roadmap, sprint and hiring plan rests on that assumption.

Agents remove it. I can open several lines of investigation at once and close most of them an hour later. Trying something costs almost nothing. Knowing whether it worked costs exactly what it always did.

The data shows where the cost went. DORA’s 2025 research across nearly 5,000 technology professionals found that AI adoption comes with higher delivery throughput and higher instability. METR’s randomized trial put 16 experienced developers on 246 real tasks. With AI tools they took 19% longer and believed they had been faster.

Speed without a system produces more output and less certainty. The constraint has moved from writing code to three things a leader owns: context, verification and decisions. An organization that keeps managing the old constraint will ship more and know less about what it shipped.

Chapter 02

Beyond Agile

Agile’s principles hold. The 2001 manifesto asks for working software delivered often, close contact with the people who need it, and regular reflection by the team. Agents make each of those easier to honor.

The ceremonies are a different matter. The manifesto never mentions a two-week sprint, a daily standup or story points. Those come from Scrum, which the Scrum Guide defines as five events inside a sprint of one month or less. They give a fixed team a steady rhythm for inspecting its work.

That rhythm was built for fixed capacity. When work can fan out and finish in an afternoon, a two-week container is the wrong size for it. When the record of the work is written as it happens, a status meeting repeats what is already on the page. I keep the principles and I replace the container.

Three ways to lay work across the same stretch of time

Waterfall

Phases run once, in order. Verification arrives near the end, so a wrong assumption is found late.

Scrum-style Agile

Equal windows sized to a fixed team. Each one ends in a review. Work is cut to fit the window.

Elastic

Microcycles sized to their outcome, several at once, each closed by its own evidence gate. Some are stopped early on purpose. The number running at one time rises and falls with the work.

  • Work
  • Ends in a review or gate
  • Stopped early
Conceptual Block lengths show the shape of each model.
What stays and what gets replaced
PracticeCallWhat it becomes
Backlog and prioritiesKeepStill decides what gets attention first.
Acceptance criteriaKeepWritten earlier and in more detail, because an agent takes them literally.
Planning and governanceKeepShort cycles raise the value of deciding what matters.
Fixed-length sprintReplaceMicrocycles sized to the outcome.
Daily standupReplaceThe record in the ticket and the pull request, read when you need it.
RetrospectiveReplaceFailure notes written into the ticket when the failure happens.

Chapter 03

The Elastic Manifesto

Eight rules. Each one comes with something you can do this week.

  1. Plan the outcome. Let capacity move.

    Write what must be true when the work is done. Decide how many parallel efforts it deserves after that.

  2. Write the evidence gate first.

    Before work starts, name the checks that close it and the person who can approve it.

  3. Keep context in systems of record.

    Give requirements, ownership and code each one home. A session can then end without losing anything.

  4. Treat agents as interchangeable.

    Write every handoff so the next session can pick it up with a different tool.

  5. Keep consequential decisions with a person.

    Publishing, production merges, spending and anything hard to undo wait for a named human.

  6. Run in parallel and name the dependencies.

    Parallel work is cheap to start. State what blocks what so it does not collide.

  7. Record failures where the work is recorded.

    A stopped path or a bad handoff goes in the ticket next to the result.

  8. Publish only what you measured.

    If a number was not observed, leave the cell empty and say so.

Rules one and two do most of the work. An outcome with a gate written in advance can be handed to anyone, run in parallel, stopped without loss and judged without a meeting. Everything else in the model follows from those two sentences being written down before the work starts.

Chapter 04

Continuous Orchestration

Continuous Orchestration is how the work moves. One outcome goes through the loop below, and that single pass is a microcycle. Several run at once.

  1. IntentWhat must be true, the boundaries, and the gate that closes it.
    Me
  2. DecompositionThe outcome is split into pieces with their dependencies named.
    Agent proposes, I accept
  3. AssignmentEach piece gets one owner and one branch. Any capable agent can take it.
    Me
  4. ExecutionResearch and implementation run in parallel. Paths that are not paying off get stopped.
    Agents
  5. Evidence gateThe checks named at the start are run and their results attached.
    Checks, then me
  6. RecordState, decisions, open issues and the next action are written down.
    Agent
  7. Next decisionAccept, send back, stop, or open the next outcome.
    Me

Where context lives

On my projects, product context and durable decisions live in Notion. Execution, ownership and acceptance criteria live in Jira. Code, review and checks live in GitHub. The tools matter less than the rule that each fact has one home and no fact lives only in a chat session.

Agent in the loop

A ring with three stores on it: orchestration at the top, data and context at the lower right, code and execution at the lower left. Arrows run clockwise around the ring from one store to the next. A group of three agents sits in the centre of the ring. One person sits above the ring, outside it, joined to the top of the ring by a dotted line.

Human oversight Observes the loop. Holds every approval.

Agent in the loop Any model.

Orchestration Jira

Data and context Notion

Code and execution GitHub

The agent works inside the loop. Orchestration tells it what is next, context tells it why, and code is where it acts. The result goes back to orchestration. I watch the loop from above and hold the approvals.

Governance

Each repository carries the same short contributor instructions for people and agents. They cover seven steps: pick up the issue, claim a single line of work, name and scope the change, verify and review, protect sensitive data, hand off explicitly, and close against evidence. The same workflow sits in 14 of my repositories.

One line in those instructions never moves. Production actions need separate authorization from a named person. An agent can open a pull request. It cannot merge to production or publish in my name.

What this asks of a leader

The job moves to the two ends of the cycle. At the start I write the outcome, the boundaries and the gate. At the end I read evidence and decide. The middle runs without me in the room.

That changes what an engineering organization is built from. Roadmaps are written as outcomes with gates attached. Managers design gates and keep context clean. Senior engineers spend their judgment on specification and review, where it compounds. The budget conversation covers people and compute together, set per outcome.

Chapter 05

A day inside my operating model

This page was built with the model it describes. Below is the full cycle, from the first ticket to the pull request, in one hour and 42 minutes. The agent here is a Claude session. An earlier cycle ran on Codex under the same handoff rules, which is rule four at work.

Friday, November 27, 2026. Central time.

Observed

Select any row to see the systems and artifacts behind it.

  1. MeOpened a discovery ticket. The working title was Agentic Cadence.
    System
    Jira, discovery project
    Artifacts
    Ticket STUDIO-45 with the goal, six deliverables and acceptance criteria. A product brief in Notion at draft v0.1 with the name still open.
    Evidence
    The ticket’s creation timestamp. This is the stated intent every later step is checked against.
  2. Me, decisionChose the name Elastic Outcome Engineering and a five-day publishing sequence.
    System
    Jira and Notion
    Artifacts
    A dated comment on STUDIO-45 recording the name, the five-day sequence and the measure of success. The same decision written into the Notion brief.
    Evidence
    A decision record with a timestamp and an owner. The comment also states that nothing publishes automatically.
  3. RecordEpic IM-19 and eleven child tickets appear in Jira inside one minute. Each child begins with an instruction to read the epic first.
    System
    Jira, site project
    Artifacts
    Epic IM-19 holding the outcome, the execution sequence and the engineering standards. Tickets IM-20 to IM-30, each with its own acceptance criteria. Issue links that mark the build ticket as blocking the five post tickets.
    Evidence
    Eleven creation timestamps inside one minute, and a dependency graph a new session can read without asking anyone.
  4. RecordA twelfth ticket is added for a starter kit.
    System
    Jira
    Artifacts
    Ticket IM-31 with acceptance criteria and a relates-to link to the build ticket.
    Evidence
    The link type. It records that the starter kit informs the page and does not block it.
  5. RecordThe design brief is added to the build ticket, IM-28.
    System
    Jira
    Artifacts
    The description of IM-28: audience, seven chapters, three visualizations and the acceptance criteria for accessibility, reduced motion and supported metrics.
    Evidence
    The ticket’s updated timestamp. The acceptance criteria written here are the gate the checks run against at 20:11.
  6. Me, thin handoffHanded the build to a new session with five characters: im-28.
    System
    Agent session
    Artifacts
    One message. No ticket link, no system named.
    Evidence
    The session transcript.
  7. Agent, asked firstSearched the project folder and past conversations, found nothing by that name, and asked what it meant.
    System
    Agent session, file access and conversation search
    Artifacts
    Two lookups: a listing of the connected project folder and a search of past conversations. Neither returned a match.
    Evidence
    The transcript shows the lookups, the empty results and a question back to me in place of a guess.
  8. MeAdded one word: jira.
    System
    Agent session
    Artifacts
    One message naming the system of record.
    Evidence
    The session transcript.
  9. AgentRead the build ticket, the epic, the product brief, five related tickets and the repository instructions.
    System
    Jira and Notion through connectors, GitHub
    Artifacts
    IM-28, IM-19, STUDIO-45 with its comments, IM-20, IM-21, IM-29, IM-31, the Notion brief and the repository’s contributor instructions.
    Evidence
    Each read is a logged tool call. The plan written at 20:02 lists everything that was read.
  10. Agent, stopped at the gapFound that the two tickets this build depends on had no output. Stopped and asked four questions.
    System
    Jira and the agent session
    Artifacts
    IM-20 and IM-21 both in Backlog with no comments. Four multiple-choice questions covering the lead case, the dependencies, the delivery path and Jira updates.
    Evidence
    The two ticket statuses at that moment, and the questions as asked.
  11. Me, four decisionsUse this launch as the lead case. Do the two dependencies first. Deliver through a branch and a pull request. Keep Jira current.
    System
    Agent session, then Jira
    Artifacts
    Four answers, copied into a comment on IM-28 at 20:02.
    Evidence
    The decisions sit on the ticket with a timestamp, where the next person or agent will find them.
  12. RecordIM-28 moves to In Progress with the outcome, the dependencies and the verification approach written on the ticket.
    System
    Jira
    Artifacts
    A status change from Backlog to In Progress on IM-28, IM-20 and IM-21. A comment stating the outcome, the four decisions, the dependencies, the verification approach, the constraints and the branch name.
    Evidence
    The verification approach is on the ticket before any code exists. That is rule two.
  13. AgentFramework definitions and the supporting research posted to the framework ticket.
    System
    Web search, page fetch, Jira
    Artifacts
    A comment on IM-20 with the definitions, the eight rules and the sources behind chapters 01 and 02, each with its link.
    Evidence
    Every figure quoted on this page traces to a linked source in that comment.
  14. AgentBuilt this page on a branch and opened a draft pull request.
    System
    Git, GitHub, Vercel
    Artifacts
    Branch feature/IM-28-eoe-feature cut from main. One commit carrying the Jira key. Draft pull request 10. A Vercel preview built from the branch.
    Evidence
    The commit hash, the pull request timestamp and a deployment status of success reported on the commit at 20:12.
  15. ChecksA site build and 31 scripted checks ran against the page at three screen widths. All passed. They cover layout, contrast, keyboard use, reduced motion, links and metadata.
    System
    Site build script, headless Chrome driven by Playwright
    Artifacts
    The build run, then a script that loads the page at 1440, 820 and 390 pixels. It tests overflow, script errors, text size, touch targets, contrast ratios, keyboard control of the comparison, the chapter rail, reduced motion, links and metadata. It also loads the page with JavaScript off.
    Evidence
    31 results listed in the pull request under Validation, with what was not run. A handoff comment on IM-28 records base, branch, head commit, pull request, finished criteria and open criteria.
  16. Me, two decisionsReviewed the preview, approved publication and merged.
    System
    Vercel preview, GitHub, Jira
    Artifacts
    The preview read on a real screen. Twelve rounds of direction from me, each one a new commit on the same pull request and a comment on the ticket. Then the approval and the merge.
    Evidence
    The pull request history shows every round. The merge is the publication decision, and it triggers the production deploy.
Times come from Jira, the ticket comments and the pull request.

What the system caught

  • A thin handoff. I handed off with five characters and no system named. The session asked before it acted. A team without that rule gets a confident guess and finds out later.
  • A sequencing gap. The build ticket was top priority while the two tickets it depends on were empty. The agent checked dependencies first, stopped, and put the choice in front of me. I resequenced in one answer and nothing was built on a missing foundation.
  • The gate, sized to the risk. This page is static, so its gate was a build and 31 scripted checks listed in the pull request. On SlicerBridge the gate was 13 CI jobs passing before I authorized the merge. The gate is written first and it scales with what can break.

What stayed with me

The name, the sequence and the choice of case. The order of work once the gap surfaced. The delivery path. Approval to publish and the merge. Six decisions before the build and two after it. Everything between them ran without me.

Chapter 06

Measuring what matters

Velocity and story points measure how busy a fixed team is. They say nothing once capacity moves. These are the five measures I hold an elastic organization to.

The scorecard
MeasureWhat it tells you
Lead time to verified outcomeHow long from stated intent to evidence accepted. The number the business feels.
First-pass gate rateHow often work clears its gate on the first attempt. Low means the outcome or the context was written badly.
Rework after acceptanceWhat came back after someone said yes. The real quality number.
Cost per verified outcomePeople and compute together, per accepted result. This is the unit the budget is set in.
Decision latencyHow long finished work waits for a person. In an elastic system this is the queue that matters.
This page’s cycle Observed
MeasureValueSource
First ticket to pull request1 h 42 minJira and GitHub timestamps
Plan size1 epic, 12 tasksJira
Decisions that needed me before the build6Two at 18:43, four at 19:59
Handoffs caught and corrected1The record above
Checks at the evidence gate31 of 31 passedPull request

Chapter 07

Adopt the framework

Start with one task. You do not need to change how your team plans to see whether this works.

  1. Pick one real task and write its outcome in two sentences.
  2. Write the evidence gate before anyone starts: the checks and the approver.
  3. Decide where requirements, ownership and code each live, and keep them there.
  4. Hand the task to a fresh session with only the record. Ask it to tell you the current state.
  5. Keep a list of what failed, next to the result.

Step four is the test. If a new session cannot tell you the state from the record, a new engineer cannot either, and you have found your first fix.

Across an organization

The order of a rollout matters. Start with one team and one outcome, with the gate and the record written to the standard above. Next, put the contributor instructions into every repository that team touches, so people and agents work to the same rules. Then replace velocity with the scorecard in the operating review and move planning from sprints to outcomes. Ceremonies come off the calendar as the record makes them redundant, one at a time, with the team watching the numbers.

A starter kit is on the way. The first release is plain Markdown: an outcome brief, a handoff template and one worked example. An MCP server follows, so any agent that speaks the protocol can read and write the same record. Each piece will be linked here when it ships.

Put this to work

This is how I build and lead engineering. If it is where you are taking your organization, let’s talk.

Sources

  1. Principles behind the Agile Manifesto, 2001.
  2. Ken Schwaber and Jeff Sutherland, The Scrum Guide, November 2020.
  3. DORA, State of AI-assisted Software Development, 2025.
  4. METR, Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity, July 2025.

Download resume

Your email is recorded when you download.